Offshore Structures
Troll M11 Module
The Troll M11 module was safely delivered in offshore Norway to installation crane vessel.
Sevan's FPSO Pirenema
The Troll M11 module was safely delivered in offshore Norway to installation crane vessel.
Total USA's Matterhorn Seastar TLP
The TLP hull with a total width of 323.5 feet, a height of 125.0 feet and a pontoon length of 179.0 feet, built in just 12 months at the Keppel FELS Shipyard in Singapore, was loaded on the Tai An Kou by use of the float-on method.
Sevan's FPSO Hummingbird
Sevan's FPSO Hummingbird was successfully loaded in China and discharged in Rotterdam during April 2007.
RasGas Barzan
Three Barzan topsides were transported from HHI's yard in Korea to offshore Qater for installation by crane vessel.
Sevan's FPSO Voyageur
Sevan's FPSO Voyageur was successfully loaded in China and discharged in Rotterdam during December 2007.
Conoco Phillip's Magnolia TLP
Built in Korea and transported to Corpus Christi, Texas, the cargo suffered no damage during transit. To be sure that this voyage was successful, extensive model testing was done at Texas A&M in College Station, Texas.
AMP 2 Jacket
In March 2005, NMA and COSCOL successfully transported the AMP 1 Compression Module, the AMP 2 jacket and various loose equipment from Malaysia to the Amenam Kpono field, offshore Nigeria.